Amazon cover image
Image from Amazon.com

Estimating construction costs and schedules : experience with power generation projects in developing countries / Robert W. Bacon, John E. Besant-Jones and Jamshid Heidarian.

By: Contributor(s): Material type: TextSeries: World Bank technical paper ; no. 325. | World Bank technical paper. Energy series.Publication details: Washington, D.C. : World Bank, c1996.Description: xv, 120 p. : ill. ; 28 cmISBN:
  • 0821336703
Subject(s): DDC classification:
  • 621.3121 20 WOE 1996
LOC classification:
  • TK1193.D44 B33 1996
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Notes Barcode
Books Bangladesh Public Administration Training Centre Library General Reading Room 621.3121 WOE 1996 Available Zahid WB7066

Includes bibliographical references (p. 119-120).

There are no comments on this title.

to post a comment.